Nature Based Solutions - Implementation Models Database

Implementation model

Urban Heat Islands Strategy Plan Vienna

A short description of the NBS project

The project “Urban Heat Islands – Strategy Plan Vienna” is part of the international CE (Central Europe) project “Urban Heat Islands – Development and application of mitigation and adaptation strategies and measures for counteracting the global Urban Heat Islands phenomenon” (duration 2011-2014). Within the framework of the international project 8 metropolises are examined. Along with Bologna/Modena, Venezia/Padova, Stuttgart, Lodz/Warsaw, Prague, Budapest and Ljubljana, Wien is one of the study areas. The aim of the project “Urban Heat Islands – Strategy Plan Vienna” is the identification of measures and adaptations to reduce the negative aspects of urban warming. The intention is to develop a strategic plan for the city to implement urban and open space planning measures as well as urban ecology measures that reduce the negative aspects of urban warming. Based on planning tools and instruments of the different control levels of urban planning and development, possibilities of action for the City of Wien and in addition, opportunities to raise awareness and promote acceptance of measures that reduce urban heat effects are identified: technical measures (i.e. green spaces, water, shading, albedo, buildings, mobility, de-sealing, etc.), public relations/information (i.e. public events and competitions) and control levels/instruments (i.e. zoning and development plans, developer competitions, housing initiative and public housing, subsidies, etc.).

NBS Implementation context
Location Austria, Wien (Austria)
Latitude
Longitude
Status Project delivered (2011-2014)
Dates
Description of the NBS
NBS Scale object (building, etc.)
NBS Impacts scale • Object (building, etc.) • Neighbourhood • City
Urban density/ Soil consumption • High (dense city center, etc.) • Medium
Combined with other(s) environmental friendly solution(s)?
if other
NBS Typology
Open the NBS Solution Explorer
NBS Uban Challenges
Climate Issues Climate mitigation
Climate adaptation
Other 0
Urban water management and quality Urban water management and quality
Flood management
Other 0
Air Quality Air quality at district/city scale
Air quality locally
Other 0
Urban Space and Biodiversity Biodiversity
Urban space design
Urban space management
Other 0
Urban Regeneration and Soil Air quality at district/city scale
Other 0
Resource efficiency Food, energy and water
Raw materials
Waste
Recycling
Other 0
Public health and well-being Acustic
Quality of life
Health
Other 0
Environmental justice and social cohesion Environmental Justice: Recognition
Environmental Justice: Procedural Justice
Environmental Justice: Distributional Justice
Environmental Justice: Capabilities
Environmental Justice: Responsibility
Social Cohesion
Other 0
Urban planning and governance Urban planning and form
Governance in planning
Other 0
People Security Control of crimes
Control of extraordinary events
Other 0
Green economy Circular economy
Bioeconomy activities
Direct economic value of NBS
Other 0
Other
Stakeholder and Governance
Who Started this initiative? Governments • Regional / national government
Contracting Authority
Project manager (leader and main partners): entities names, and know-how involved
Who (else) was involved in the project ? (Inhabitants, local association, etc.)
More detail on the process and the role of the different stakeholders (How did it happen?)
OPTIONAL Considering the actual impacts, who are the primary beneficiaries of the project.
Cluster Governance Model Description
cluster5_network_governanceCollaborative_governance-
Financing
Global Estimated cost of the project -
Cluster cluster1_public_financing
FM Public financing
Description of the financing mechanism -
Business Model
Class Type Description
-
Temporal Factor
Expected time for the NBS to be fully effective after its implementation
Expected life time of the intervention
Already feedbacks on the project? In case, the project has already been adapted to new requisites, please explain the modifications brought
Success and limiting factors
Process Enablers
Class Subclass Type Description
Knowledge_drivers-
Process Inhibitors
Class Subclass Type Description
Knowledge_drivers
What makes this project a pioneer?
Field
Criteria
Brief description of the innovativeness
Has the project received a prize, an award?
Has the project received a media coverage? (in reviews, in press, etc.)
IM Keywords
References