Nature Based Solutions - Implementation Models Database
Implementation model
MA 48 Green Facade
A short description of the NBS project
The headquarters of the Municipal Department for Waste Management (MA48) are lined with a green facade. A total of 2.850 meters of aluminum trays are installed on 850sqm of facade. In close collaboration with BOKU (University of Natural Resources and Life Sciences) and the Municipal Department for Parks and Gardens (MA42), 6 types of plants are selected from 60 suitable plant species. Approximately 17.000 plants are planted, mainly perennials, grasses and herbs. The plants grow between 15 and 60 cm high, some like the catnip blooms colorfully during the summer. Green facades offer a great potential for dust filtration and air improvement. The green facade additionally offers a rain and wind protection and has a positive influence on the sound and heat insulation. The project is implemented together with MA42 and scientifically monitored and documented by BOKU University and the Institute of Meteorology. The BOKU documented microclimatic effects such as air temperature and humidity in front of, in and behind the facade, soil moisture and radiated heat. Furthermore, BOKU observated water content, building physics and biomass construction. The green wall is a development of the company TECH METALL in cooperation with the company Dachgrün
NBS Implementation context
Location
Austria, Wien (Austria)
Latitude
Longitude
Status
Project delivered (2014-2016)
Dates
Description of the NBS
NBS Scale
object (building, etc.)
NBS Impacts scale
• Object (building)
• Neighbourhood
• City
Urban density/ Soil consumption
High (dense city center)
Combined with other(s) environmental friendly solution(s)?
Project manager (leader and main partners): entities names, and know-how involved
Who (else) was involved in the project ? (Inhabitants, local association, etc.)
More detail on the process and the role of the different stakeholders (How did it happen?)
OPTIONAL Considering the actual impacts, who are the primary beneficiaries of the project.
Cluster
Governance Model
Description
cluster5_network_governance
Collaborative_governance
The project is part of the city planning strategy in Vienna and it is financed by the city as a pilot project.
Financing
Global Estimated cost of the project
-
Cluster
cluster1_public_financing
FM
Public financing
Description of the financing mechanism
The project is part of the city planning strategy in Vienna and it is financed by the city as a pilot project.
Business Model
Class
Type
Description
The façade is intended to be more than a singular project for climate adaptation; ; it should serve as an example for other buildings to duplicate. Several additional public and private façade greening projects have been initiated or are being panned since implementing the MA48 façade.
Temporal Factor
Expected time for the NBS to be fully effective after its implementation
Expected life time of the intervention
Already feedbacks on the project? In case, the project has already been adapted to new requisites, please explain the modifications brought
Success and limiting factors
Process Enablers
Class
Subclass
Type
Description
Knowledge_drivers
Process Inhibitors
Class
Subclass
Type
Description
Knowledge_drivers
What makes this project a pioneer?
Field
Criteria
Brief description of the innovativeness
Has the project received a prize, an award?
Has the project received a media coverage? (in reviews, in press, etc.)